Bathroom refit prices at a glance
Typical UK prices including labour, as a guide only. Costs vary by area, access, materials and the condition of the property, so always get a written quote.
What affects the cost?
- Sanitaryware and tile choice
- Moving the toilet, soil stack or shower position
- Electrics: lighting, extractor and underfloor heating
- Tanking and waterproofing for showers and wet rooms
- Plastering and making good after strip-out
- Waste removal and skip hire
Example itemised quote
This is what a professional bathroom refit quote looks like when it's broken down line by line, so you can compare like for like.
Instant-Estimate for tilers →EXAMPLE QUOTE
Family bathroom refit
"Strip out the family bathroom, new bath with shower screen, close-coupled toilet, vanity basin, tile floor and walls full height, new extractor and spotlights."
Strip out & skip hire
1 item × £650.00
£650.00
Plumbing first & second fix
1 lot × £1,450.00
£1,450.00
Supply sanitaryware (bath, WC, vanity)
1 set × £1,600.00
£1,600.00
Tiling walls & floor incl. materials
26 m2 × £85.00
£2,210.00
Electrics: extractor & 4 downlights
1 lot × £520.00
£520.00
Illustrative prices. Instant-Estimate uses your own labour rate and price library, and quotes work with or without VAT.
Common questions
How long does a bathroom refit take?
Most standard bathrooms take one to two weeks from strip-out to finished, depending on tiling and plastering.
Is it cheaper to keep the same layout?
Yes. Keeping the toilet, bath and basin in the same positions avoids moving waste pipes and usually saves hundreds of pounds.
For contractors
Quote jobs like this in 2 minutes
Snap a few photos, describe the bathroom refit out loud, and Instant-Estimate builds the itemised quote for you, priced with your own rates.
Try it now for FREETry it FREE. Upgrade when it pays for itself.